AWI Project Timeline

The vision to create a great waterfront for the nation’s capital must be matched by an equally powerful and bold implementation strategy. The AWI Project Implementation Timeline illustrates our accomplishments to date, priority projects for the next five years and the benefits to be gained by revitalizing the Anacostia waterfront in the short- and long-term. The table below details the planning accomplishments of the AWI and the funding appropriations received since 2000.



Plan Accomplishments and Funding Appropriations

 
The AWI Project Implementation Timeline
The AWI Project Implementation Timeline
CLICK THE IMAGE TO ENLARGE

Year

2000

2001


2002




2003
Planning Accomplishments

Signing of AWI MOU

Presentation of Preliminary Framework Recommendations
Rezoning of Buzzard Point

Release of Hill East Draft Master Plan
Adoption of CSO Long Term Control Plan
Approval of Hill East Master Plan by DC Council

Release of Southwest Waterfront Plan
Release of Near Southeast Urban Design Framework
Release of South Capitol Street Gateway Study
Release of AWI Draft Framework Plan
Approval of Southwest Waterfront Plan by DC Council

Funding Appropriations

$1.3 M Riverwalk

$35 M Capper-Carrollsburg Hope VI in the Near Southeast
$6.4 M Poplar Point

$2.8 M Southwest Marina



$50 M CSO Long Term Control Plan
$5 M Kenilworth Park, part of Anacostia RiverParks
$2.5 M Canal Blocks Park in the Near Southeast
$2 M St. Coletta’s School in Hill East
$500,000 South Capitol Street Gateway Study